Maintenance & Repair Services

Request a Quote
Close-up of hands fitting a module onto a DIN rail in a distribution panel

Planned Maintenance and On-Site Fault Response

Transformers are among the critical and costly components of MV/LV facilities. Without regular maintenance, failures can lead to production losses, safety risks and long power outages. AESA Enerji carries out planned maintenance, thermographic (thermal imaging) inspection and fault response at MV/LV facilities on site with its expert team.

Scope of Services

  • Distribution Transformer Maintenance - Oil level, moisture content, insulation, turns ratio and winding resistance tests
  • Medium Voltage Switchgear Maintenance - Function tests of disconnector, circuit breaker and earthing mechanisms
  • Protection System Equipment Maintenance - Relay, fuse, current and voltage transformer tests
  • Metering System Equipment Maintenance - Inspection of current/voltage transformers and energy analysers
  • Main and Sub-Distribution Panel / Circuit Breaker Maintenance
  • Power Factor Correction Panel and System Maintenance
  • Thermographic (Thermal Imaging) Inspection and Reporting
  • Fault Response Services

Transformer Maintenance

Transformer oil level, moisture content, insulation, turns ratio and winding resistance tests are performed. Cooling, protection relays, connection points and bushings are checked; connection points are examined with a thermal camera. Where necessary, an oil sample is sent for laboratory analysis. The results are delivered with a transformer maintenance report.

MV Switchgear Maintenance

In MV switchgear, function tests of the disconnector, circuit breaker and earthing mechanisms are performed. Contact surfaces are cleaned; where deemed necessary, mechanical parts are greased and insulating spray is applied to electrical connections and surfaces. Circuit breaker contact resistance measurement, breaker opening–closing time testing and thermal checks are carried out.

Maintenance Process

  • On-site review of the facility and equipment
  • Preparing the maintenance plan and scheduling the power outage
  • Maintenance, tests and measurements
  • Thermal camera inspection
  • Delivery of the maintenance report

Tests and Measurements

Depending on the facility's needs, the following tests and measurements are carried out by our team or arranged through authorised partners; the results are reported and handed over.

  • Distribution transformer: winding resistance, turns ratio and insulation resistance measurements; transformer oil analysis (performed by a laboratory)
  • MV circuit breakers and disconnectors: contact resistance measurement, mechanical function (opening-closing) check
  • Current and voltage transformers (CT/VT): ratio, polarity and insulation checks
  • Surge arresters: insulation and visual inspection
  • Protection relays: function test (by secondary injection)
  • LV panels and circuit breakers: insulation measurement, connection tightness check, thermal camera inspection
  • Earthing installation: earth resistance and continuity measurements
  • MV cables: insulation test (with an authorised partner where necessary)

Fault Response

For faults in MV and LV systems, a preliminary assessment is first made over the call line; where necessary, the field team is dispatched to identify and eliminate the source of the fault. Contracted facilities receive priority response. All work carried out is recorded and kept together with the maintenance history.

Request a Maintenance Contract

The full name, phone and address details you share in this form are processed by AESA Enerji Anonim Şirketi to respond to your request and to provide you with a quotation. For details and your rights, see the Privacy Notice.

Contact
Şerifali Mah. Kızkalesi Sk. No:1A/6 Ümraniye / İstanbul
info@aesaenerji.com